E-Bill  | Outage Info | Products & Services |  Contact Us |  Customer Service  | General Info  | What's New  Emp & Dir Login

 

 

Home  


Home

 




 
Security Light Leasing

Tipmont is now offering a security light leasing program which includes planning, installation, maintenance, and un-metered electric energy for your security lights

Outdoor lighting makes good sense for home and business. The Tipmont Outdoor Lighting Lease Program is a carefree and low cost way of providing that needed lighting.

Security Lighting Lease Options

Standard Fixtures
(Click on fixture description for pricing information)
Description Lumens Wattage
  *HPS Open Bottom 9,500 100
  *MV Open Bottom 8,500 175
    MV Open Bottom 22,000 400
    MV Flood Light 22,000 400
    HPS "Cobra Head" (street light) 29,000 250
    HPS "Contemporaire" (shoebox) 29,000 250
  *HPS or MH Directional Flood Fixture 45,000 400
Ornamental Fixtures
Description Lumens Wattage
    HPS "Colonial" W/ Pinto Post 9,5000 100
    HPS "Contempo" W/ Pinto Post 9,500 100
    MV "Contempo" W/ Pinto Post 8,000 175
    HPS "Contempo" W/ Pinto Post

 

16,000 150
*HPS-High Pressure Sodium Bulb, produces a yellow/orange light
*MV-Mercury Vapor Bulb, produces a blue/white light
*MH-Metal Halide Bulb, produces a white light

openbottom.gif (6004 bytes) hpsopen.gif (4670 bytes) openbottom1.gif (3954 bytes)

 

HPS Open Bottom Fixture Monthly Charges (100 Watt)

Fixture Only

Overhead Service

Underground Service

W/Wood Pole

W/Fiberglass Pole

W/Wood Pole

W/Fiberglass Pole

$7.50

$11.85

$18.35

$13.30

$19.80

*Fixture Only means pole already exists

Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   
For each additional 100' of conductor only (no pole) $0.30



openbottom.gif (6004 bytes) mvopen.gif (4646 bytes) openbottom1.gif (3954 bytes)

 

MV Open Bottom Fixture Monthly Charges (175 Watt)

Fixture Only

Overhead Service

Underground Service

W/Wood Pole

W/Fiberglass Pole

W/Wood Pole

W/Fiberglass Pole

$7.50

$11.85

$18.35

$13.30

$19.80

*Fixture Only means pole already exists

Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   

For each additional 100' of conductor only (no pole)

$0.30


openbottom.gif (6004 bytes) mvopen.gif (4646 bytes) openbottom1.gif (3954 bytes)

 

MV Open Bottom Fixture Monthly Charges (400 Watt)

Fixture Only

Overhead Service

Underground Service

W/Wood Pole

W/Fiberglass Pole

W/Wood Pole

W/Fiberglass Pole

$11.60

$15.95

$22.45

$17.40

$23.90

*Fixture Only means pole already exists

Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   
For each additional 100' of conductor only (no pole) $0.30

 


openbottom.gif (6004 bytes) mvopen.gif (4646 bytes) openbottom1.gif (3954 bytes)

 

MV Flood Fixture Monthly Charges (400 WATT)

Fixture Only

Overhead Service

Underground Service

W/Wood Pole

W/Fiberglass Pole

W/Wood Pole

W/Fiberglass Pole

$17.50

$22.45

$29.65

$23.90

$31.10

*Fixture Only means pole already exists

Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   
For each additional 100' of conductor only (no pole) $0.30



hpscobra_p.gif (6061 bytes) hpscobra_b.gif (4670 bytes) hpscobra_d.gif (2173 bytes)

 

HPS "Cobra Head" Monthly Charges (250 WATTS)

Fixture Only

Overhead Service

Underground Service

W/Wood Pole

W/Fiberglass Pole

W/Wood Pole

W/Fiberglass Pole

$10.00

$14.35

$20.85

$15.80

$22.30

*Fixture Only means pole already exists

Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   
For each additional 100' of conductor only (no pole) $0.30

 


hpscobra_p.gif (6061 bytes) hpscobra_b.gif (4670 bytes) hpscobra_d.gif (2173 bytes)

 

HPS "Contemporaire" Monthly Charges (250 WATTS)

Fixture Only

Overhead Service

Underground Service

W/Wood Pole

W/Fiberglass Pole

W/Wood Pole

W/Fiberglass Pole

$10.00

N/A

N/A

$15.80

$22.30

*Fixture Only means pole already exists

Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   
For each additional 100' of conductor only (no pole) $0.30

 


 

hpscobra_p.gif (6061 bytes) hpscobra_b.gif (4670 bytes) hpscobra_d.gif (2173 bytes)

 

HPS/MH Directional Flood Monthly Charges (400 WATT)

Fixture Only

Overhead Service

Underground Service

W/Wood Pole

W/Fiberglass Pole

W/Wood Pole

W/Fiberglass Pole

$13.90

$18.85

$26.05

$20.30

$27.50

*Fixture Only means pole exists already

Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   
For each additional 100' of conductor only (no pole) $0.30



hpscobra_p.gif (6061 bytes) hpscobra_b.gif (4670 bytes) hpscobra_d.gif (2173 bytes)

 

HPS "Contempo" Fixture Monthly Charges (100 WATT)
All monthly rates are for Underground Service Only

$10.90

 

Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   
For each additional 100' of conductor only (no pole) $0.30

 


hpscobra_p.gif (6061 bytes) hpscobra_b.gif (4670 bytes) hpscobra_d.gif (2173 bytes)

 

MV "Contempo" with Pinto Post Monthly Charges
All monthly rates are for Underground Service Only

$12.50


Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   
For each additional 100' of conductor only (no pole) $0.30



hpscobra_p.gif (6061 bytes) hpscobra_b.gif (4670 bytes) hpscobra_d.gif (2173 bytes)

 

HPS "Contempo" with Pinto Post Monthly Charges
All monthly rates are for Underground Service Only

$12.70



Possible Additional Charges

Monthly Charges

Transformer Charge (When a customer does not have an active account and transformer at service location.)

$9.00

   
For each additional 75 feet of underground conductor, when more than 75 feet is required.

$1.70

   
For each additional pole including up to 100 feet of conductor required to reach service location

$4.35

   
For each additional 100' of conductor only (no pole) $0.30